BullCharts Forum Homepage
Forum Home Forum Home > BullCharts > BullScript
  New Posts New Posts RSS Feed: Calculate dates
  FAQ FAQ  Forum Search   Calendar   Register Register  Login Login

Calculate dates

 Post Reply Post Reply
Author
Message / View First Unread Post
G-fer View Drop Down
Newbie
Newbie


Joined: 26 Jan 2021
Posts: 1
Post Options Post Options   Quote G-fer Quote  Post ReplyReply Direct Link To This Post Topic: Calculate dates
    Posted: 07 Feb 2021 at 1:50pm
Hi all,

I'm hoping one of the script gurus can help me with 2 problems that have been frustrating me. The first is that I can't figure out the code to produce a column in a scan that will show me the date 4 days before the scan date. For example, if I start a scan on 6/2, I would like to produce a column using bullscript that says shows 2/2. The built in scan criteria dialogue doesn't work if you choose to display date minus 4 days, you get an error message, so it needs to be done with bullscript.

The second thing that I would like to do is hide columns that I don't need to see. This helps to keep a spreadsheet smaller.

Any help would be much appreciated.

Graham
Back to Top
 Post Reply Post Reply

Forum Jump Forum Permissions View Drop Down

Bulletin Board Software by Web Wiz Forums® version 9.69
Copyright ©2001-2010 Web Wiz